Tenggarong - National SAR Agency (Basarnas) issued a tentative conclusion that the bridge structure Kukar labile post-collapse incident that occurred on Saturday (26/11/2011) yesterday.
"Observing the existing bridge structure. Once we have observed, the bridge structure, still unstable collapse of the process which he did," Associate Chief Marshal Basarnas Daryatmo, while giving a press conference at Basarnas SAR Command Post, located in the vicinity of the bridge collapse, Jl Wolter Monginsidi, Sunday (27/11/2011).
According Daryatmo, in addition to experiencing instability, the structure of the bridge pillars were tilted a few degrees from the pole erectness.
"It's tilted from erectness half mast. Coordination Rescue us with the whole team still waiting for the technical team from the Public Works Department team," said Daryatmo.
"The decision of how to search and rescue efforts tomorrow, yes still waiting for a team of Public Works to issue a recommendation" he added.
As reported, Kukar Bridge that connects the District 2 and District Across Tenggarong Tenggarong, collapsed on Saturday (11/26/2011). Public Works Minister Djoko Kirmanto who also arrived at the scene said the collapse of the bridge is relatively rare considering the bridge is still 10 years old.
Until tonight, the victim died still account for 4 people and as many as 40 people were injured due to collapse of the bridge. Meanwhile, the police, there were 33 people reported missing after the incident.
"There were 33 reports of the reported loss of their family members," said East Kalimantan Police chief Gen. Bambang Widaryatmo in the same occasion.
No comments:
Post a Comment